Ashing & Burn off muffle furnace
provide a continuous flow of preheated air through the chamber,
comply with ISO 1171:2010, ASTM D3174-04:2010 & ASTM D4422.
Air inlet & tall chimney give airflow of 4 to 5 changes per minute
Low chamber height holds airflow close to samples for optimum combustion
Heating element protected from chemicai attack
Preheating of air before it enters the chamber gives excellent uniformity
Sample tray and loading handle
Maximum temperature 1200 deg c
Volume 18 liter,Digital control
Internal :w196mm*h235mm*d400mm
External :w505*d675*h705mm
Ceramic chimney for ventilation
include double tier rack system
and loading handle